Current Geomembrane Projects

Portland

​Jan 2021 – current
​Pond Size: 150,000 m2​

Construction Quality Control:

Geotest are currently engaged by Wannon Water to carry out design, supply and installation of a new floating cover and liner at Portland, Victoria. This included removal of the existing cover and liner.

Design Constultant:

Geotest also acted as a design consultant for the installation and material.

Ravenswood Goldmine

​Apr 2021 – Feb 2022
​Mine Size: 750,000 m2​

Installation:

Geotest were engaged by Ravenswood Gold to carry out level 1 CQA supervision over the client supplied bituminous geomembrane (BGM) liner.  Installation crew worked under the careful supervision for safely installing the liner. They are using specialist lydraulic BGM deployment equipment.

Kalimna Dam

​Feb 2021 – Apr 2021
​Pond Size: 44,000 m2​

Supply and Installation:

Geotest were engaged by Hunter Brothers to carry out supply and install of the HDPE single liner.